LOGO
  • Home
  • Company
    • Management
    • Board of Directors
    • Community Development
    • Career Opportunities
  • Projects
    • Wellgreen (Ni-Cu-PGM YK)
    • Shakespeare (Ni-Cu-PGM ON)
    • Lynn Lake (Nickel MB)
    • Uruguay Project
    • NI 43-101 Resource
    • Image/Video Galleries
  • Investors
    • Share Info/Structure
    • Analyst Coverage
    • Media/Print Coverage
    • Investor Presentation
    • Upcoming Conferences
    • Financial Reports
    • Filings
    • Industry Articles
  • News
    • 2013
    • 2012
    • 2011
    • 2010
    • 2009
    • 2008
    • 2007
  • Contact
PROJECTS
  • Wellgreen (Ni-Cu-PGM YK)
  • Shakespeare (Ni-Cu-PGM ON)
  • Lynn Lake (Nickel MB)
  • Uruguay Project
  • NI 43-101 Resource
Image/Video Galleries
  • Wellgreen
  • Lynn Lake

INVESTORKIT

  • August 2012 - Wellgreen PEA Report
  • August 2012 - Wellgreen Metallurgical Report
  • May 2013 - Corporate Presentation
  • May 2013 - Corporate Factsheet
  • Greg Johnson's Interview with CEO.ca
  • 2012 Wellgreen Project Video

STOCKINFO




Delayed by 20 minutes
  • receive the latest news right to your email

Image/Video Galleries

  • Wellgreen
  • Shakespeare
  • Lynn Lake
  • Conference

Wellgreen

Geological Model Videos:

  • 3D Geological Block Model (Long Section)
    3D Geological Block Model - Long Section
    (Summer 2011)
  • 3D Geological Block Model (Plan View)
    3D Geological Block Model - Plan View
    (Summer 2011)
  • Wellgreen Drillholes Wireframe - Starting from Plan View
    Wellgreen Drillholes Wireframe - Plan View
    (Summer 2011)
  • Wellgreen Drillholes Wireframe - Starting from Section View
    Wellgreen Drillholes Wireframe - Section View
    (Summer 2011)

Full 3D Gallery >>

Photo Gallery

  • Wellgreen Underground Drilling
    Yukon Government Site Tour (Fall 2012)
  • Wellgreen Underground Drilling
    Yukon Government Site Tour (Fall 2012)
  • Wellgreen Underground Drilling
    Wellgreen Surface Drilling
    (Aug 2012)
  • Wellgreen Underground Drilling
    First Nation Meeting
    (Aug 2012)
  • Wellgreen Underground Drilling
    Underground Drilling
    (Aug 2012)
  • Wellgreen Underground Drilling
    Wellgreen Camp
    (Aug 2012)
  • Wellgreen Underground Drilling
    Wellgreen Surface Drilling
    (June 2012)
  • archive

Shakespeare

Photo Gallery

  • Shakespeare Project
    Shakespeare
    (Sept 2012)
  • Shakespeare Project
    Shakespeare
    (Sept 2012)
  • Shakespeare Project
    Shakespeare
    (Sept 2012)
  • Shakespeare Project
    Shakespeare
    (Sept 2012)
  • Shakespeare Project
    Shakespeare
    (Sept 2012)
  • Shakespeare Project
    Shakespeare
    (Sept 2012)
  • Shakespeare Project
    Shakespeare
    (Sept 2012)
  • archive

Lynn Lake

Geological Model Video:

  • Lynn Lake Drillholes with Conceptual Modeling
    Lynn Lake Drillholes with Conceptual Modeling
    (Summer 2011)
  • Flat View
    Plan View Video Image
    (Summer 2011)
  • Section View
    Section View Video Image, Looking North
    (Summer 2011)
  •  Section View, Looking West
    Section View Video Image, Looking West
    (Summer 2011)

Photo Gallery

  • Drilling (Sept 2010)
    Drilling
    (Sept 2010)
  • Cores (Sept 2010)
    Cores
    (Sept 2010)
  • Mine Housing
    Mine Housing
  • Mine Housing
    Mine Housing
  • Core Sample
    Core Sample
  • Storage Area
    Storage Area
  • Mine Rail Road
    Mine Rail Road
  • archive

Conferences and Events

Photo Gallery

  • New Orleans Investment Conference
    (Oct 2012)
  • New Orleans Investment Conference
    (Oct 2012)
  • 2012 PDAC
    (Mar 2012)
  • 2012 PDAC
    (Mar 2012)


Mineral resources that are not mineral reserves do not have demonstrated economic viability. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this website.

Qualified Person under NI 43-101
Danniel Oosterman, P.Geo., a consultant of the Company is the qualified persons responsible for the technical information on this website.

Cautionary Note Regarding Mineral Resources and Mineral Reserves
Readers should refer to the Company's current technical reports and other continuous disclosure documents filed by the Company available on Sedar at www.sedar.com for further information on the mineral resource estimates of the Company's projects, which are subject to the qualifications and notes set forth therein, as well as for additional information relating to the Company more generally. Mineral resources which are not mineral reserves, do not have demonstrated economic viability. Inferred mineral resources have insufficient confidence to allow the meaningful application of technical and economic parameters or to enable an evaluation of economic viability suitable for public disclosure. Neither the Company nor readers can assume that all or any part of an inferred mineral resource will be upgraded to indicated or measured mineral resource. Most projects at the inferred mineral resource stage do not ever achieve successful commercial production. Each stage of a project is contingent on the positive results of the previous stage and that there is a significant risk that the results may not support or justify moving to the next stage.

Quality Control and Quality Assurance
Prophecy Platinum executes a quality control program to ensure best practice in sampling and analysis. Samples are cut and split for assay with the remaining sample retained for reference. Blanks, Standard Reference Material (SRM), and duplicates were inserted into the sample stream every 20th sample. A duplicate sample is taken every 20th sample of core. The selected sample is sawn in half and then sawn in half again. The quartered core is then placed into two different sample bags with different sample numbers and sealed. The SRM material comes from Natural Resources Canada and Analytical Solutions Limited. These were inserted into the sample stream immediately after the second duplicate. The SRMs used are WMS-1a, WPR-1 and WGB-1. Sample Blanks are obtained from two sources; granodiorite from a local quarry and garden marble from hardware stores in Whitehorse, Yukon. A Blank sample is inserted into the sample stream after the SRM. Assayed samples are transported in sealed and secured bags for preparation at ALS Chemex Prep Lab located in Whitehorse, Yukon. Pulverized (pulp) samples are shipped for analysis to ALS Chemex Assay Laboratory in Vancouver, B.C. ALS Chemex is an ISO/IEC 17025:2005 accredited laboratory and registered under ISO 9001:2000.
Quality assurance and quality control are monitored using scatterplots, Thompson-Howarth plots and statistical analysis to ensure duplicates, blanks and standard data are reliable and indicate robustness of overall results. ALS Chemex quality-assurance procedures are also included in this process."

Click here for the Qualified Person information, forward-looking statements and the cautionary note.

LOGO
  • Home
  • Company
  • Projects
  • Investors
  • News
  • Contact
  • Toll Free Telephone 1.800.459.5583
  • 2nd Floor, 342 Water StreetVancouver, BC V6B 1B6
  • Email:info@prophecyplatinum.com Download vCard
  • © Copyright 2012
  • Prophecy Platinum Corp.
  • All Rights Reserved
Web Design Vancouver by AromaWebDesign.com